Liquid Coating Roof Projects
Domestic Contract, Beach Road, Kessingland, Suffolk
Client: Domestic
This was part of expansive extension works to a domestic property. High specification was a
priority, and as such, a new Liquid Plastics Decothane liquid applied waterproofing system was installed. This system consists of a Liquid
Base Coat roller applied to the roof deck, a fibreglass matting laid into the Base Coat whilst wet for reinforcement, and a dark grey Liquid
Top Coat applied over the top, leaving the system guaranteed for 10 years.
HMP Blundeston, Blundeston, Suffolk
Client: HMP Prison Services (via Vinci Construction)
This project consisted of a cold applied overlay of the existing
defective built-up felt roof coverings. A new Liquid Plastics Decothane liquid applied waterproofing system was installed, incorporating a LPL
Carrier Membrane, 120mm Decotherm Insulation, Liquid Base Coat roller applied to the roof deck, a fibreglass matting laid into the Base Coat
whilst wet for reinforcement, and a dark grey Liquid Top Coat applied over the top, leaving the system guaranteed for 25 years.
Sizewell Power Station, Sizewell, Suffolk
Client: Sizewell Power Station
This project consisted of a cold applied overlay of the existing defective built-up felt
roof coverings. A new Liquid Plastics Decothane liquid applied waterproofing system was installed, incorporating a LPL Carrier Membrane,
120mm Decotherm Insulation, Liquid Base Coat roller applied to the roof deck, a fibreglass matting laid into the Base Coat whilst wet for
reinforcement, and a dark grey Liquid Top Coat applied over the top, leaving the system guaranteed for 10 years.
The Alfred Corry Museum, The Harbour, Southwold, Suffolk
Client: The Alfred Corry Museum
This project was to give the existing roof coverings additional life span by
overcoating with a Polyroof Protec liquid applied waterproofing system. The existing coverings were left in place so as not to
compromise the building contents, and to enable the museum to operate as normal throughout the works. Upon completion, the roof was